Industrial assembly, company relocation, machine relocation

You are planning your company relocation, machine relocation or industrial assembly? Do you have a complicated installation of a processing machine? Your high-quality hall floor must withstand the work undamaged and the work must be carried out emission-free? Yes we can!

Our well-deserved portfolio of front and telescopic forklift trucks, pick & carry cranes and heavy lifting equipment makes us a powerful partner for all kinds of applications.

For each possible and impossible situation, we work for you by our years of experience, a special solution to also implement your project quickly, professionally and reliably.

We also have the possibility to sufficiently insure your machines or systems during the transportation, the assembly or disassembly.

We will come to your site, create deployment plans and offer you a carefully considered solution.


Regardless of the problem you have, we will find the solution. We are there for you!


Areas of application

- machine industry
- plastics industry
- automotive and supplier industry
- printing industry
- forming industry
- Chemical industry
- Food industry
- power plant industry
- pharmaceutical industry
- medical technology

 

Tank installation

For this project we had to bring two filter tanks with a weight of up to 10.000 kg including accessories into a hall with difficult structural conditions and then set them up. By using the PC40.0t-E and ST096-7.2t-D, our team made this possible.

Play video

Paper press on the road

We dismantled a printing press (maximum individual weight of the parts 12,000 kg) in a printing house with the help of our PC040.0t-E. After the removal, we sent it on its way to a new location.

Working in millimetres with our ST096-12.0t-D!

Absolute precision was necessary: The oven with a weight of 5,600 kg had to be inserted and only narrowly fitted through the opening. To complicate the situation, the terrain in front of the opening had an inclination of up to 5°. Tact and sensitivity were required!

Spacey operation

Over a production line a fire alarm system had to be installed. The only possible access was through a small opening. This is where our space stage, the STR160-4.0t-D soffit, was used.

Play video

Optimal assembly with our PC40.0t-E

At a new building, where only assembly aids with electric drive were permitted, we lifted a bridge crane with a span of 28000 mm to its destination.

Company relocation with PC25.0t-E

Several metal processing machines with individual weights of max. 18,000 kg were transported under narrow space conditions and then positioned at the new location.

Operation "Gangway"

The driving simulation centre also required a gangway. The limited space and several levels required the construction of platforms and ramps which was a nice challenge.

Exchange action bridge crane

An old 120 to bridge crane had to be replaced by a new one. Again, we were challenged by the tight conditions, floor loads and the narrow time window. A box girder had an impressive cross-section of 2.00 x 1.40 m and a weight of 28,000 kg.

Play video

A very " tight " thing... :-)

A pipe system had to be replaced under difficult structural conditions. It was the perfect location for our Pick and Carry crane Hercules and the Mast arm platform Stupidix.